New Plant

Investment in a new venture on a greenfield site, is a long term financial commitment. CIM recognizes the critical need for an examination across a number of aspects  to a venture .Some of these aspects are:

Process and Product Design

Based on the medium am long term requirement from a business perspective, suitable product and process design parameters would be arrived at. This would need to take into consideration land and utility infrastructure.

Detailed Project Report (DPR)

DPR is required for financing Institutions. The DPR would cover all aspects of the project and would be a ready to implement document.

Site Analysis

Advisory for all issues relating to the selection of a site. Besides the project engineering requirement, the analysis would examine the medium- and long-term facilities planning for growth.

Machine selection

A critical component in the DPR, CIM would advise on an optimum configuration based on the market requirements, trends and competition analysis.

Project Implementation

Full responsibility for installation and commissioning to deliver stated output and budgeted costs.

Off scope Items

CIM could take the responsibility for procurement of all brought out items (off battery limits) and integrate them.

Licenses

Procurement of all licenses relevant for the operations (BIS, Factory license, etc) would be covered in the contract.

Liaison

In case the plant needs to be approved by major branded water suppliers.   